Issue Date: 10/25/2024 |
Contract Number: Prop SW3-24 |
Rotating Drum Replacement Project
Description:
The items of work include, but are not necessarily limited to the following: Contract No.1 – General Construction: This work shall include providing all shipping, labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the Rotating Drum Replacement. The project includes the work shown on the Plans, and described in the Specifications consisting of general construction. General construction includes, but is not limited to, all work necessary for the removal and replacement of the existing steel drum Rotating Drum and accessories with new as shown on the Plans, and as specified, and shall consider use of the following existing Rotating Drum equipment and parts for operation of the new replacement Rotating Drum. The cost of any equipment, material, and labor necessary for the removal and re-installation of the following existing equipment and parts shall be included in the general construction work: 1. Ring gear 2. Roller bands (tires) 3. Electric drive motor 4. Transmission cooling system 5. Transmission 6. Pinion gear/shaft/pillow blocks 7. Trunnions/trunnion wheels and retainer rollers 8. Steel framed grillage support of equipment items 1 Thru 7 9. Existing Rotating Drum foundations 10. Hydraulic gate control – terminal adaptor/contacts - copper conductor plates and accessories Any metals scheduled to be removed and/or damaged during construction may be handed over to the Owner for disposal. The Owner will direct the Contractor where on site to stockpile said material.
Contract No. 2 – Electrical Construction: This work shall include providing all labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the Rotating Drum Replacement. The project includes the work shown on the Plans, and described in the Specifications consisting of electrical construction. Electrical construction includes, but is not limited to, all work necessary for temporary removal of electrical equipment, devices, cable tray, and circuiting in the project area limits of construction. All removed electrical equipment and devices are to be stored and placed back in operation at project completion. New circuiting including conduit, wiring, and junction boxes are required to complete the work. The equipment and devices to be removed and replaced include lighting, emergency stops, receptacles, control circuiting, and fire alarm.
Due Date: 11/22/2024 2:00 PM
Contract Term: 245 calendar days from notice to proceed
Location: 32230 State Hwy 10, Walton, NY 13856
Ad Type: General
Technical contact:
|
Barton & Loguidice
David Mitchell
Chief Engineer
443 Electronics Parkway Liverpool, NY 13088 United States
Ph: 315-457-5200
Fax:
dmitchell@bartonandloguidice.com
|
Primary Contact:
|
Delaware County
Public Works
Tyson Robb
Solid Waste Coordinator
P.O. Box 311 2 Bridge Street Delhi, NY 13753 United States
Ph: 607-832-5828
Fax: 607-832-6071
tyson.robb@co.delaware.ny.us
|
Secondary contact:
|
Delaware County
Public Works
Lisa Henderson
Asst. to the Commissioner
P.O. Box 311 2 Bridge Street Delhi, NY 13753 United States
Ph: 607-832-5800 ext.5821
Fax: 607-832-6071
dpw@co.delaware.ny.us
|
|